What are the steps to rough in plumbing in basement after the concrete is busted up?.?
I'm trying to do the rough in plumbing in my basement and I've never done rough in plumbing before. I watched a couple of videos and busted up the concrete to route the pipes but I don't really know anything about grading and so forth. The pipe I'm running it to seems to be 3 1/2". Is that considered 4"? How much room do I need around the pipe to get into it? How far would I even cut so that I could fit a fitting on it? I mean it's not like I can move it around once I cut it.
As you can see I'm in over my head but I've never built walls before and now I've framed a 1,600 foot basement. I've never built soffits before but they look great. I do have some electrical experience so I've wired the whole basement and I have done some underground work with that so I've glued pvc for underground applications. Can anyone please help?
Thanks