How to prepare arena footing in a flat clay based area.?
I would like to set up a small arena to help me out with my training. My vision is a 50' X100' "watermelon arena" that can have one end blocked off to make a 50' hexagonal round pen. That center piece can be easily removed to leave a 50' X 100' for initial riding training. I will use this pen for beginning ground work and early riding.
The problem is our climate and soil.
It is flat as a board here and the soil is hard gray clay. It is slippery as hell when it is wet, several months of the year. In the summer it gets hot and can run 90 to 100+ for 90 days at a stretch. When it gets hot and dry (June July August) big cracks open up in the clay and it is hard as a brick.
This is a problem because all that expensive sand runs right into those cracks the first time it rains and just disappears from the face of the earth.
Do any of y'all have any ideas of how to amend the footing?
And just to stop this in it's tracks, I do not ride in the heat of the day in summer.