Yahoo Answers is shutting down on May 4th, 2021 (Eastern Time) and beginning April 20th, 2021 (Eastern Time) the Yahoo Answers website will be in read-only mode. There will be no changes to other Yahoo properties or services, or your Yahoo account. You can find more information about the Yahoo Answers shutdown and how to download your data on this help page.
Trending News
Progress Chennai(India)MRTS -- residents in Puzhithivakkam worried on where Rly.Stn will be located.?
can any one help if they know information --
There are many settlers constructed houses at Puzhuthivakkam with approved Lay-out/plan approval, etc.,
Construction Area for Railway Station require large area.
residents are worried about the exact locations of the Railway Station - to get satisfied that they are not displaced.
my feeling is that Railways plan will be such that the displacement of residents will not be there -- many disagree
on enquiry it is understood that Puzhuthivakkam station starts at 1500 M (1,5KM) middle point 1650 m (1.650KM) and ends at 1800M (1.8KM) - the mute question is how much are is required for platform (length 300M fixed) but width for the purpose of Stair case, elevator, escalator, lift, parking area, dispersal area (for public use) and approach road to Railway station. will it be 150 ft or 150M (500 ft.) -- people resides around the planned Rly Station are worried lot.
can any one contact concerned officials at MRTS, Highways, CMDA and through some light.
Media personnel can help us as this is on public interest
the information collected from various souces indicate - by all probability -- from Vellachery Rly. Stn -- next (Puzhuthivakkam)
Middle of Rly Station -- 1650 Metres
Begining of Rly Stn - 1500 Metres
End of Rly. Stn - 1800 Metres
Length of Station 280 to 300 metres
width of Rly. Station 50M + 50M (100 Metres) either side - each side will have extension of 50 Metres from Rly. Line.
Inner ring road width - 20 Metres + 20 Metres either side.
Rly line 10 Metres.
approach road (at either end of station will be about 7.5 Metres.
these are thumb rules applied for other MRTS Projects - it may vary - station to station.
Location of station may also vary based on soil condition and other conveient factors based on several other factors.
final outcome - one can reasonably expect in another 3 to 6 months when MRTS; CMDA, & Highways finalise the final plan.
--------------
the above are only indications with approximate value - may not be give correct position.
==========
1 Answer
- 1 decade agoFavorite Answer
I am also disturbed over the news. The railway authorities are
to immediately come out with a detailed report in this regard.
please follow up.