Yahoo Answers is shutting down on May 4th, 2021 (Eastern Time) and beginning April 20th, 2021 (Eastern Time) the Yahoo Answers website will be in read-only mode. There will be no changes to other Yahoo properties or services, or your Yahoo account. You can find more information about the Yahoo Answers shutdown and how to download your data on this help page.
Trending News
Which is cheaper - having a basement built or building a story of a house yourself?
My husband and I are planning on building our own home - as in my husband is going to do the majority of the work. We are trying to get the cost down as much as possible. We have not yet contacted local contractors, but the quote that I found is that having a basement built costs $25-35 per sq foot. From what I have been told, the basement is the cheapest level of the house to have built...but does that make it cheaper than building a first floor on a slab foundation ourselves rather than having a walkout basement first floor built?
5 Answers
- ?Lv 78 years ago
Both having a basement and a basic slab floor will require some excavation. The basement will require heavier equipment and more work than just prepping a slab floor. The cost of a basement will be the more expensive of the two. As to what you put on the slab - that's going to have its associated costs too.
Since doing a basement yourself requires you to know how to operate heavy machinery, if you can do that and rent the equipment then it will most certainly be cheaper than paying someone to do it for you. But the cost of that versus the cost of building a second story onto a house yourself, I'd think - or should I say "Guess" is that building the second level yourself will be much less expensive than paying someone to dig a basement for you.
Hope this helps.
'av'a g'day mate.
'')
- JrbottLv 68 years ago
Boy are you in for a big surprise. Contractors love to run into people like you who know nothing about the trade. They will promise you one thing and deliver another at a new cost. Unless you have a lot of experience in building hire someone to be the general contractor. The over runs will eat you alive.
Everything you do to put down a slab you have to do for a basement. Seweage lines, power lines, etc, except for the brick walls that a basement requires and the first set of floor joist. So, yes a basement is cheap.
You should really visit homes just like the one you want to build and decide if that home is really the one for you because once it's started any change is going to cost you big bucks. So decide and cast it in concrete that the plan you chose is the one you want.
Also, get a good lawyer to write up your contracts between the subcontractors so you don't get taken.
- Anonymous5 years ago
To do most of the work yourself. That is the cheapest way in all honesty. There really is no difference in pricing from stick built to systems built homes. Also, you are on the right track building a 2 story instead of a ranch as most of your cost is eaten up in basement and roof trusses. You considerably cut down basement size and the amount of trusses with a 2 story. My advice, shop around. Get quotes and bids and do not jump into anything. Builders go over, most often, so be careful! Our builder went over 22k on our new house, it was a nightmare! Also, it is ok to cut corners on certain items. You do not need the most expensive tub surround, carpet or countertops. However well insulated windows are a good call. An appraisal will not judge your home by the brand name of the items in it, just that they are newer. Do not stick money in where you do not need to.
- Irv SLv 78 years ago
With current steel form concrete casting, a basement
is the cheapest floor area you can buy.
Also makes plumbing & wiring a whole lot easier in labor costs.
Source(s): Retired Electrical Consultant - How do you think about the answers? You can sign in to vote the answer.
- Anonymous8 years ago
obviously building it yourself on a slab would be the most affordable option
sorry to say but you needing to ask makes me wonder if you two have the skills or experience needed to even tackle such a project - your basement cost is for raw unfinished space, not a studded, drywalled living space with electric, plumbing, HVAC and flooring.